Treat the run as part of the plan
An attached run changes the full yard footprint, door locations, drainage and daily access. Lock those decisions before committing materials.
Practical guide / planning first
A useful run supports flock movement and a human service path, while its roof, drainage, mesh and ground transition work together as one system.

Run planning
It helps organize the questions that belong in a reviewed plan. It is not a substitute for local requirements or final construction details.
Leave practical space for the flock's normal routine.
Keep a route for cleaning and inspection.
Review the roof, mesh and ground edge together.
An attached run changes the full yard footprint, door locations, drainage and daily access. Lock those decisions before committing materials.
A covered area can support use in wet weather, but it also needs a deliberate drainage and ventilation review.
Predator resistance depends on the complete system: mesh, corners, doors, roof transition and base detail.
Check 01
Check 02
Check 03
Next planning step